MED4115 Television Studio Production Skills Diary Week 5

Learning Diary Week 5 – 28/02/14

On this day we filmed our first assessment which was a 3-4 minute scripted news report. For this assessment, each group member was required to do a floor role and a gallery role of their choosing. I decided to do Floor Manager and Vision Mixer. I feel that both takes with my assessed roles went well and I was able to demonstrate my knowledge of the role.

Unfortunately, as the first two or three takes of the day took around one hour each, we fell behind our planned schedule meaning we had to cut down on rehearsals. We also had to do an additional take as a member from another class joined our production day and needed to do his chosen assessed roles.

Overall I think the assessment went well as we didn’t have any major problems and as a class we coped with the issues that did arise well.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s